-R myreqId Status switch

Sep 19, 2011 at 4:58 AM

How do you use the [-R myreqId] switch on a status request?

I would like to get the status of the most recent request, not them all and I was thinking I could use this switch to assign a myreqid on the creation of the job, but this switch is not listed as an option.

How else can it be used?